WEST COURT, JESUS COLLEGE WINS RIBA AWARDS
MAY 2018
We are delighted that our project West Court for Jesus College Cambridge has won an RIBA Regional Award and Tom McGlynn was awarded the RIBA East Project Architect of the Year. The project design includes the refurbishment and extension of the Grade II listed Webb Building with new café pavilion and basement bar, and the remodelling and extension of the 1970’s Rank Building fronting Jesus Lane.
The judges commented “This extension to Jesus College manages the difficult trick of feeling entirely old fashioned in its use of hand crafted materials … while remaining entirely modern in its loose geometry, use of daylight and simplicity of forms. Jesus College now offers a sequence of rational, thoughtful spaces that seems inevitable, but we know took a great deal of architectural skill and determination to deliver”
CATHERINE HUGHES BUILDING PLANNING APPROVAL
MAY 2017
Our new student accommodation scheme for Somerville College, has been awarded planning approval unanimously by Oxford City Council. The project, known as the Catherine Hughes Building, will provide 68 bedrooms, allowing the College to accommodate all their undergraduates on site. This is our third building for Somerville College, further to our work on the ROQ student housing and the extension to the Philip Dowson designed Wolfson building.
The new building has a frontage on to Walton Street, with a Graduate Reading Room at ground floor level. The use of red brick will reflect the neighbouring buildings, with articulated brickwork elements around generous windows to provide a rhythm to the façade. Framed setbacks at third floor level allow the new building to align with key levels on the adjacent Penrose Building and to provide variety to the roof line. Internally, bedrooms are arranged in to clusters with kitchens and circulation spaces utilising direct and borrowed natural light and forming focal points for social activity.
Enabling works, involving the demolition of existing buildings, are due to commence in the next few months, with the main construction expected to start on site at the beginning of 2018.