< Back to News

THE WELCOME BUILDING

SEPTEMBER 2017

The Welcome Building

The Welcome Building in Bishop Auckland consists of a new viewing tower and central ticketing hall for the The Auckland Project. It acts as an access point and gateway to the wider site whilst also giving views over the town and landscape setting. The tower – a timber framed structure – is now well under way on site.

The building team has worked tirelessly and with the highest level of precision, to build the in-situ concrete lift shaft. Working from the ground up seemed to take an age.

Meanwhile, the enormous larch glulam beams have been carefully crafted and manually grey-oiled in the joiner’s workshop.

The frames are now being lifted into position on site and suddenly the building can be seen. Almost in an instant. As if the past four years had happened in the blink of an eye.

We are so excited and proud – even – to see this fantasy project becoming real at last. But with completion on the horizon, time seems to now move all too fast.

OPENING OF LAMDA

JUNE 2017

Opening of LAMDA

Our newly completed building for the London Academy of Music and Dramatic Art has its official opening on the 14th June.  Her Royal Highness Princess Alexandra, the Royal Patron of LAMDA will be in attendance.  The project included the formation of a new black-box studio theatre and associated front and back of house facilities to the existing building, construction a new 6,000m2 building providing ten new flexible drama/ dance studios, a second black-box studio theatre and foyer, a full size training auditorium and ancillary accommodation.