SOCIAL HOUSING EXHIBITION
FEBRUARY 2018
On the 15th February a 4-month exhibition opened at the Center of Architecture in New York. The exhibition is based on Karakusevic Carson Architects’ book ‘Social Housing, New European Projects’ in which our Stirling Prize nominated project Darbishire Place was included.
The exhibition is curated by Karakusevic Carson Architects and features projects and contributions by:
Adam Khan Architects (UK), Assemble (UK), Avenier & Cornejo Architectes (France), Chartier Dalix (France), Hans van der Heijden (The Netherlands), Einszueins (Austria), Hawkins\Brown (UK), Haworth Tompkins Architects (UK), Karakusevic Carson Architects (UK), Lacaton & Vassal (France), LAN architecture (France), Mae (UK), Mecanoo (The Netherlands), Mikhail Riches Architects (UK), Mole (UK), muf architecture/art (UK), Niall McLaughlin Architects (UK), s333 architecture + Urbanism (UK), Sergison Bates architects (UK & CH), TVK (France), Witherford Watson Mann (UK) and zanderroth architeckten (Germany). The exhibition was first shown at the Royal Institution of British Architects in London from 18 April to 28 May 2017.
A SITE FOR SAURIIS
JANUARY 2017
Our proposal to redevelop the grounds of the Natural History Museum is due to start on site this month. The work to the main entrance – the first of three phases – will introduce level access to this area for the first time while also restoring the Grade-I listed fabric to its former glory.
The works include changing levels, repaving the forecourt, restoring railings, installing planting, and repairing or reinstating original terracotta details across the site.
Ahead of this, the main entrance and central hall of the Museum are now closed while both teams gear up for construction – including some unusual enabling works. As part of these works Dippy the diplodocus has now been dismantled ahead of going on tour around the country; to be eventually recast in bronze for the next phase of our project.
The railings have now been removed for off-site restoration and re-painting:
And scaffolding is also going up for the removal of display cases and various specimens:
This will need to go up again halfway through construction of Phase 1 allow for delivery of the blue whale skull through our active site. Here it is just before it left the Museum.
If you’re wondering how that that will fit through the front doors, the answer’s simple: the same way the elephants do.
Phase 1 is due to complete mid-July ahead of the main entrance reopening to the public shortly after. In the meantime, there’s a pop-up conservation studio in the Darwin Centre – which we highly recommend – where you can see the conservationists at work restoring the whale’s bones.