< Back to News

RIBA STIRLING PRIZE SHORTLIST

JUNE 2015

RIBA Stirling Prize Shortlist

Niall McLaughlin Architects are thrilled that Darbishire Place, Whitechapel Peabody Housing has been shortlisted for this year’s Stirling Prize.

Writing about Darbishire Place in a piece written for the Guardian, Olivier Wainwright said ” Filling in the gap of a second world war bomb site, the building follows the sobriety of Darbishire’s designs for “cheap, cleanly, well drained and healthful dwellings for the poor”, but updates it with generous internal spaces and sharply-crafted details that make it as near to a model housing scheme as you could find”.

The RIBA President Stephen Hodder, says: “The shortlisted projects are each surprising new additions to urban locations – hemmed into a hospital car park, in-filling an east London square, completing a school campus. But their stand-out common quality is their exceptionally executed crafted detail.”

The other 5 buildings making this years shortlist are Burntwood School in Wandsworth, designed by Allford Hall Monaghan Morris; the Maggie’s Cancer Care Centre in Lanarkshire, by Reiach and Hall; the NEO Bankside luxury apartments in Southwark, Rogers Stirk Harbour; the Library and Teaching Building at the University of Greenwich, by Heneghan Peng; and the Whitworth Art Gallery in Manchester, by MUMA.

ST CROSS GROUND BREAKING

FEBRUARY 2015

St Cross Ground Breaking

Building has started on our project for St. Cross College in Oxford. It will accommodate a library, seminar rooms and 53 post-graduate rooms just behind St. Giles. Soon after excavation started, we uncovered the shrouded remains of a woman buried in 1642 during the English Civil War.  Oxford Archaeologists dated her from the coins that had been placed on her eyes. After a pause to remove the remains, the builders have started foundations around the historic walls. Completion is expected by May 2016.

A Ground Breaking Ceremony was held on the site on 27th February.   Practical Completion of the building is anticipated in May 2016. You can follow progress on site by accessing the contractor’s webcam here (un:stcrosscollege; pw:oxford)