< Back to News

NAZRIN SHAH BUILDING – STEELWORK

JULY 2015

Nazrin Shah Building – Steelwork

Just over two years since our first tentative steps towards imagining what sort of space a new auditorium for Worcester College might possibly be like, we find ourselves enclosed within a spidery sketch, looking up to the trees through a skeletal enclosure of steel. We watched in excitement as our drawings were scribed across the site, first in neon spray paint and little red sticks, later excavated into deep ravines. We pick our way across the lines that had become so familiar on paper and are now concrete obstacles in a muddy field. The reality of this transition only became real as we stood looking across at the steel columns in this picture. They map out the positions of the stone fins that radiate around the curved facade of the new auditorium, with the sloping beams above us silhouetted against the bright July sky marking the future locations of the sculpted folds to the soffit.

TAPESTRY BUILDING PROGRESS

MARCH 2015

Tapestry Building Progress

Looking south from the roof garden, the view is framed by the ‘beak’ of the building looking south over Regents Canal and out towards the BT tower.

The concrete frame of the Tapestry (T1) building is approaching completion, with just two more floors to be constructed. This space on the 8th floor will become an outdoor roof garden enclosed either side by two level ‘townhouses’ and a tower to the north. The area will be open to residents and landscaped with trees and gardens.