< Back to News

NAZRIN SHAH BUILDING – STEELWORK

JULY 2015

Nazrin Shah Building – Steelwork

Just over two years since our first tentative steps towards imagining what sort of space a new auditorium for Worcester College might possibly be like, we find ourselves enclosed within a spidery sketch, looking up to the trees through a skeletal enclosure of steel. We watched in excitement as our drawings were scribed across the site, first in neon spray paint and little red sticks, later excavated into deep ravines. We pick our way across the lines that had become so familiar on paper and are now concrete obstacles in a muddy field. The reality of this transition only became real as we stood looking across at the steel columns in this picture. They map out the positions of the stone fins that radiate around the curved facade of the new auditorium, with the sloping beams above us silhouetted against the bright July sky marking the future locations of the sculpted folds to the soffit.

T1 CONCRETE PANELS

MAY 2015

T1 Concrete Panels

Pre-cast concrete panels for our T1 project at Kings Cross are currently being manufactured at the Techrete factory in Ireland with installation of the first panels due to commence in the next week. Here are some ‘as struck’  images of the capital panels that will be fitted to the top of the piers.