NATURAL HISTORY MUSEUM PROGRESS
MARCH 2017
Below are some from the Natural History Museum site showing the scaffold ‘tunnel’ going up at the Museum. This is the framework required to lift, manipulate, and move the blue whale skull into position in a few weeks.
Though the main hall has had a sperm whale in it before, this was only around 15m long. In contrast, the blue whale, the largest known animal to have ever existed, is about 30m long once assembled.
Unfortunately, due to the various extensions and alterations to the Museum over time, the skull can only come in via the front doors. And – much like a very large, very heavy, very valuable sofa – it’s a case of squeezing it in at strange angles.
JESUS COLLEGE TOPPING OUT
JANUARY 2017
On the 11th January Jesus College held a topping out ceremony to celebrate the laying of the final stone on the roof of its West Court development. The project provides state-of-the-art conference and lecture facilities, hotel and student accommodation, and social spaces including a new café and bar.
Professor Ian White who led the ceremony said: “We are delighted that the chance has arisen to restore the college site to its original boundaries and excited by the opportunity it brings to take the facilities we can offer to students, fellows, alumni and the wider world to a new level of excellence. Our West Court Development has an outstanding selection of spaces and accommodation, suitable for a wide range of different uses”
The below image shows the Managing Director of Cocksedge Building Contractors Steve Nugent, the Estates Burser Christopher Pratt and Professor Ian White at the topping out ceremony.