CAMBRIDGE DESIGN AND CONSTRUCTION AWARDS
APRIL 2018
We are delighted that our West Court Phase 1 project for Jesus College has won this year’s Cambridge Design and Construction Award in the Conservation, Alteration and Extension category. The annual awards celebrate recent, high quality developments that have been built in the city. To visit the awards page please click here.
NATURAL HISTORY MUSEUM PROGRESS
MARCH 2017
Below are some from the Natural History Museum site showing the scaffold ‘tunnel’ going up at the Museum. This is the framework required to lift, manipulate, and move the blue whale skull into position in a few weeks.
Though the main hall has had a sperm whale in it before, this was only around 15m long. In contrast, the blue whale, the largest known animal to have ever existed, is about 30m long once assembled.
Unfortunately, due to the various extensions and alterations to the Museum over time, the skull can only come in via the front doors. And – much like a very large, very heavy, very valuable sofa – it’s a case of squeezing it in at strange angles.