< Back to News

A SITE FOR SAURIIS

JANUARY 2017

A Site for Sauriis

Our proposal to redevelop the grounds of the Natural History Museum is due to start on site this month. The work to the main entrance – the first of three phases – will introduce level access to this area for the first time while also restoring the Grade-I listed fabric to its former glory.

The works include changing levels, repaving the forecourt, restoring railings, installing planting, and repairing or reinstating original terracotta details across the site.

Ahead of this, the main entrance and central hall of the Museum are now closed while both teams gear up for construction – including some unusual enabling works. As part of these works Dippy the diplodocus has now been dismantled ahead of going on tour around the country; to be eventually recast in bronze for the next phase of our project.

The railings have now been removed for off-site restoration and re-painting:

And scaffolding is also going up for the removal of display cases and various specimens:

This will need to go up again halfway through construction of Phase 1 allow for delivery of the blue whale skull through our active site. Here it is just before it left the Museum.

If you’re wondering how that that will fit through the front doors, the answer’s simple: the same way the elephants do.

Phase 1 is due to complete mid-July ahead of the main entrance reopening to the public shortly after. In the meantime, there’s a pop-up conservation studio in the Darwin Centre – which we highly recommend – where you can see the conservationists at work restoring the whale’s bones.

JESUS COLLEGE PLANNING APPROVAL

APRIL 2015

Jesus College Planning Approval

We have won planning and listed building consent for the first phase of a significant development for Jesus College, Cambridge.

The West Court development includes the sensitive refurbishment and extension of a Grade II Listed building to provide research facilities, offices, social spaces and accommodation. A new café pavilion and basement bar extends the building’s north elevation and provides a prominent link to the rest of the College.

A 1970s building closes the courtyard to Jesus Lane and will be refaced, refurbished and converted to provide a lecture theatre with research facilities and two floors of academic accommodation. Linking the two existing buildings, a new entrance building houses conference facilities and serves the lecture theatre, research spaces and an exhibition room. It will provide access to future phases of the development including a new purpose-built auditorium, formal courtyard and nursery along with storage, archive and sports facilities.

The Master of Jesus College, Professor Ian White, said “We are excited by the opportunity the West Court development brings to take the facilities we can offer to students, alumni and the wider world to a new level of excellence.”